Quote Originally Posted by Pit Bull View Post
The only thing that disappointed me in that structure was they sort of goofed by not building it further towards the junction by about a 100 feet. The last two sections on each side of the southern end of the stadium cannot see the board and the sections next to them have to strain their neck to see it.....and the answer was to build another jumbotron on the north end of the stadium. So we spent around 15 million (from what I hear) to build that gigantic south end jumbotron. Now we are going to tear it down....hmmm.....we must be flush with dough. There's a unique concept in most really good engineering schools and in good engineering itself. It's called planning. Sometimes I wonder if we teach our grads about planning and the costs of poor or no planning for at least 20 years down the road.
Yeah, they planned for the jumbotron to cover the eyesore and the eyesores roof.